I-15 with new Bonded Wearing Course Treatment
Date

July 31, 2017

Category

Projects

UDOT commissioned Geneva Rock to rotomill out 1-1/2″ of existing asphalt on I-15 and replace with 1″ of Bonded Wearing Course (BWC) sprayed onto the pavement. Geneva Rock is the first company to use the Roadtec Spray Paver in Utah. BWC is an industry-leading technology that delivers a durable, open-graded, drainable surface with a lifespan of 10+ years. Additionally, this project required adding 33 signs and replaced 4 overhead signs. The project required a repave of the full width of I-15 north and south for 7.5 miles. The most challenging aspect of this project was traffic control with safety as a first priority in a short time frame.
Owner: UDOT
Location: Davis County, UT I-15 corridor
Project Manager: James Rasmussen
Core Competencies: Asphalt Paving
Date Completed: August 2017
  • I-80 MP 20-30 in Wendover City

    This project was commissioned by UDOT, It was to primarily a mill and fill on 10 miles worth of Freeway and 1.5 miles in Wendover City using SMA batched at our Point of the Mountain Batch Plant. Along with a rehabilitation project, all the other incidental items such as striping, signage, utilities, concrete flat work

  • I-80; Silver Creek to Wanship

    Innovation, technology and environmental consciousness are of the highest importance at Geneva Rock. These were vital standards during the I-80 Silver Creek to Wanship project that was recently completed. UDOT teamed up with Geneva Rock to replace this 7 1/2 mile stretch of I-80 that had corroded due to the high altitude and harsh environment.

  • Emery Avenue Waterline

    Project consisted of replacing old 8″ ductile iron pipe with modern water line