2300 East Millcreek, UT
Date

November 10, 2016

Category

Projects

2300 E. Mainline
The majority of the work on 2300 E. proper is the reconstruction of 2300 E. with widenings on both sides of the road. Geneva Rock also improved the irrigation system through the winter and the design calls for updating the storm drain system as well. Both sides of the road will have new curb and gutter and sidewalk installed along with a small area at 33rd S. considered the “updated area” with colored concrete sidewalk, driveways, and park strip. We will also roto-mill and overlay the whole road once we have all the widenings built and curb and gutter installed.
Round-A-Bout
This is the main area where the I-80 on and off ramps are located. The activities of this work area includes excavation and embankment of three round-a-bouts as well as the corresponding drainage work and the grading and paving. The main round-a-bout manages all the I-80 traffic and the other two small round-a-bouts service two small side streets that connect into the existing neighborhoods.
  • Geneva Rock SR-73 & Sunset Drive, Eagle Mountain

    The 2016 Eagle Mountain Road Project consists of widening the North and South sides of the SR-73 roadway at Sunset Drive. This widening will accommodate daily school bus and pedestrian traffic to and from Black Ridge Elementary School. The project consists of removal and replacement of curb and gutter, widening the road for more lanes

  • I-80; Silver Creek to Wanship

    Innovation, technology and environmental consciousness are of the highest importance at Geneva Rock. These were vital standards during the I-80 Silver Creek to Wanship project that was recently completed. UDOT teamed up with Geneva Rock to replace this 7 1/2 mile stretch of I-80 that had corroded due to the high altitude and harsh environment.

  • I-15 2700 North to 1100 South, Brigham City, UT

    I-15; 2700 N to 1100 S in Box Elder County is a $42 million dollar project consisting of 26 new lanes miles of concrete and asphalt paving adding new lanes north and south on the inside shoulder of I-15 from Farr West to Brigham City. The project also includes eight new bridge widenings in conjunction