Academy Avenue in Herriman UT
Date

August 3, 2017

Category

Projects

The Academy Parkway at Mountain View Corridor in Herriman City hired Geneva Rock to develop and install  the new Academy Parkway that will link up Mountain View Corridor to the new Real Salt Lake Soccer Practice Complex. This project requires positive connection MSE wall with geo-grid 17 feet tall. 65,000 cubic yards of cut and fills, new 24″ ductile iron pipe connecting the newly construction pump house to the new construction concrete water tank. The last step to this project was adding a new signalized intersection.
Owner: Herriman City
Location: Herriman City, UT
Project Manager: Paul Ellis
Core Competencies: Earthwork, Pipelines & Drainage, Sitework, Utilities, Asphalt Paving
Date Completed: November 2017
  • Emery Avenue Waterline

    Project consisted of replacing old 8″ ductile iron pipe with modern water line

  • Lehi City Waste Ditch Improvements

    The city of Lehi, Utah sought to increase the allowable amount of water their municipal drainage ditch could handle. The Lehi City Wast Ditch Improvements project includes removal of  four existing pipe culverts, replacing them with pour-in-place box culverts.  Utilities and asphalt paving work is also being completed at the end of the project to improve the surrounding areas. Geneva

  • I-15 with new Bonded Wearing Course Treatment

    UDOT commissioned Geneva Rock to rotomill out 1-1/2″ of existing asphalt on I-15 and replace with 1″ of Bonded Wearing Course (BWC) sprayed onto the pavement. Geneva Rock is the first company to use the Roadtec Spray Paver in Utah. BWC is an industry-leading technology that delivers a durable, open-graded, drainable surface with a lifespan of