Lehi City Waste Ditch Improvements
Client

Lehi City Waste Ditch Improvements

Date

April 10, 2017

Category

Projects

The city of Lehi, Utah sought to increase the allowable amount of water their municipal drainage ditch could handle. The Lehi City Wast Ditch Improvements project includes removal of  four existing pipe culverts, replacing them with pour-in-place box culverts.  Utilities and asphalt paving work is also being completed at the end of the project to improve the surrounding areas. Geneva Rock was contracted to perform this work from January – May of 2017.
  • I-80; Silver Creek to Wanship

    Innovation, technology and environmental consciousness are of the highest importance at Geneva Rock. These were vital standards during the I-80 Silver Creek to Wanship project that was recently completed. UDOT teamed up with Geneva Rock to replace this 7 1/2 mile stretch of I-80 that had corroded due to the high altitude and harsh environment.

  • Runway and Taxiway Pavement Rehabilitation

     Salt Lake City Department of Airports required upgrade and a pavement rehabilitation on several of their runways (16-34). Taxiway ‘A’ was reconstructed, then milled and paving was completed on the runways and taxiway.

  • SR-73 & Sunset Drive, Eagle Mountain

    The 2016 Eagle Mountain Road Project consists of widening the North and South sides of the SR-73 roadway at Sunset Drive. This widening will accommodate daily school bus and pedestrian traffic to and from Black Ridge Elementary School. The project consists of removal and replacement of curb and gutter, widening the road for more lanes