US-40 Main Street Heber, UT
Date

November 10, 2016

Category

Projects

This Project is a 3.75 Mile Mill and Fill/Overlay. We are profile milling 3″ off the existing surface and replacing it with 1 1/2″ of HMA (Hot Mix Asphalt) and 1 1/2″ of SMA (Stone Matrix Asphalt). The project also includes a new .25 Mile long Chain-up area on the northeast corner of SR-32 and US-40. This includes excavating the existing grade, placing Borrow, Granular Borrow and UTBC (Untreated Base Course) then capping it with 3″ of HMA and 1 1/2″ of SMA. Upon completion of the SMA, we will grind for grooved-in paint lines.
HMA 1/2″ Mix – 20,000 Ton
SAM 1/2″ Mix – 20,000 Ton
  • Geneva Rock SR-73 & Sunset Drive, Eagle Mountain

    The 2016 Eagle Mountain Road Project consists of widening the North and South sides of the SR-73 roadway at Sunset Drive. This widening will accommodate daily school bus and pedestrian traffic to and from Black Ridge Elementary School. The project consists of removal and replacement of curb and gutter, widening the road for more lanes

  • I-80; Silver Creek to Wanship

    Innovation, technology and environmental consciousness are of the highest importance at Geneva Rock. These were vital standards during the I-80 Silver Creek to Wanship project that was recently completed. UDOT teamed up with Geneva Rock to replace this 7 1/2 mile stretch of I-80 that had corroded due to the high altitude and harsh environment.

  • I-15 2700 North to 1100 South, Brigham City, UT

    I-15; 2700 N to 1100 S in Box Elder County is a $42 million dollar project consisting of 26 new lanes miles of concrete and asphalt paving adding new lanes north and south on the inside shoulder of I-15 from Farr West to Brigham City. The project also includes eight new bridge widenings in conjunction