Vista Station Six Parking Lot – Draper, UT
Date

November 10, 2016

Category

Projects

Vista Station 6 comprised of 250,000 square feet of parking lot paving and road base placement. We had the pleasure to work with Jacobsen Construction, who was the prime contractor, and our relationship strengthened as we accelerated our work in order to help them meet their schedule with the owner.
  • Lehi City Waste Ditch Improvements

    The city of Lehi, Utah sought to increase the allowable amount of water their municipal drainage ditch could handle. The Lehi City Wast Ditch Improvements project includes removal of  four existing pipe culverts, replacing them with pour-in-place box culverts.  Utilities and asphalt paving work is also being completed at the end of the project to improve the surrounding areas. Geneva

  • I-80; Silver Creek to Wanship

    Innovation, technology and environmental consciousness are of the highest importance at Geneva Rock. These were vital standards during the I-80 Silver Creek to Wanship project that was recently completed. UDOT teamed up with Geneva Rock to replace this 7 1/2 mile stretch of I-80 that had corroded due to the high altitude and harsh environment.

  • SR-73 & Sunset Drive, Eagle Mountain

    The 2016 Eagle Mountain Road Project consists of widening the North and South sides of the SR-73 roadway at Sunset Drive. This widening will accommodate daily school bus and pedestrian traffic to and from Black Ridge Elementary School. The project consists of removal and replacement of curb and gutter, widening the road for more lanes

Comments

Write a comment:

*

Your email address will not be published.

Copyright © 2017