6200 South 6100 West to SR-111
Owner

UDOT

Location

UT SR-111

Contractor

Geneva Rock

Core Competencies

Earthwork, Pipelines & Drainage, Demolition, Asphalt Paving, Ready-Mix Concrete, Utilities

Date Completed

November 2016

The 6200 South; 6100 West to SR-111 is a UDOT project consisting of 50,000 yards of excavation, 3,500 LF of new storm drain, retention ponds, 9″ thick PCCP roadway, curb & gutter, sidewalk, traffic signals, highway lighting system, and new landscaping. This project is located in West Valley City next to Geneva Rock’s concrete batch plant, and will be a new two lane road connecting Mountain View Corridor to SR-111.
  • I-80; 1300 E to I-215 Interchange

    The project runs 7 days per week night and day with multiple lane restrictions during both day and night. This is a maintenance project as UDOT will put out to bid in 10 years to re-build the whole project.

  • I-15; Farr West to Brigham City

    The I-15 North of Brigham City consisted of widening 26 lane miles if interstate roadway from Farr West to Brigham City, Utah. Project included widening 8 bridges with new drainage, pipe lining and a new retaining barrier wall. The project also included reconstruction of the entire 13 mile corridor including the Port of Entry in

  • Academy Avenue in Herriman UT

    The Academy Parkway at Mountain View Corridor in Herriman City hired Geneva Rock to develop and install  the new Academy Parkway that will link up Mountain View Corridor to the new Real Salt Lake Soccer Practice Complex. This project requires positive connection MSE wall with geo-grid 17 feet tall. 65,000 cubic yards of cut and