Academy Avenue in Herriman UT
Owner

City of Herriman

Location

Academy Avenue and Mountain View Corridor

Project Manager

Paul Ellis

Core Competencies

Earthwork, Pipelines & Drainage, Demolition, Asphalt Paving, Ready-Mix Concrete, Utilities

Date Completed

November 2017

The Academy Parkway at Mountain View Corridor in Herriman City hired Geneva Rock to develop and install  the new Academy Parkway that will link up Mountain View Corridor to the new Real Salt Lake Soccer Practice Complex. This project requires positive connection MSE wall with geo-grid 17 feet tall. 65,000 cubic yards of cut and fills, new 24″ ductile iron pipe connecting the newly construction pump house to the new construction concrete water tank. The last step to this project was adding a new signalized intersection.
  • Provo City Rehabilitation

    This project consisted of concrete removal and replacement on sidewalks, curbs and water ways prior to milling and paving the streets. We had multiple areas that were worked in across town simultaneously. The challenge on this project was the coordination of several crews and moving machinery in multiple areas so we can move from one

  • Silver Creek to Wanship

    Innovation, technology and environmental consciousness are of the highest importance at Geneva Rock. These were vital standards during the I-80 Silver Creek to Wanship project that was recently completed. UDOT teamed up with Geneva Rock to replace this 7 1/2 mile stretch of I-80 that had corroded due to the high altitude and harsh environment.

  • Emery Avenue Waterline

    Project consisted of replacing old 8″ ductile iron pipe with modern water line

Comments

Write a comment:

*

Your email address will not be published.

Copyright © 2017