I-80; MP 20-30 in Wendover City
- Owner: UDOT
- Location: I-80 Milepost 20-30 in Wendover, UT and NV
- Project Manager: Dexter Tan
- General Contractor: Geneva Rock Products
- Core Competencies:
Earthwork, Pipelines & Drainage, Demolition, Asphalt Paving, Ready-Mix Concrete - Year: August 2017
This project is primarily a mill and fill on 10 miles worth of Freeway and 1.5 miles in Wendover City using SMA batched at our Point of the Mountain Batch Plant. Of course, along with a rehabilitation project, all the other incidental items such as striping, signage, utilities, concrete flat work and several more.
With our haul round time between 5 to 6 hours, there was an immense pressure on the management team to plan very much ahead with little room for error. SMA is a challenging product to work with, but our team managed to achieve incentive bonus for smoothness. We also utilized a brand-new Traffic Control Device, Portable Variable Speed Limit Signs, where it allowed us to reduce the speed limit from 80mph down to 50mph. Especially when there is nothing but just a Traffic Barrel separating our workers and live freeway traffic, I would attribute the immensely safe record on the project to this. Project is slated to complete on schedule and a huge part that contributed to the success of this project is the great partnership the management team has with UDOT and their representatives.