Mountain View Corridor Intersection Construction

This intersection next to  Mountain View Corridor had a fast track schedule which required detailed communication to meet deadlines. Phase I had to be completed by June 15 to correspond with the Grand Opening of the new Mountain View Mall. We were able to complete all the required work in time.

Work included: excavation, grading, and compaction for construction of roadway

  • 18,500 yards of concrete roadway; 10,000 yards of asphalt roadway
  • 1,700 linear feet of RCP storm drain with boxes
  • 1300 linear feet of 10” Sewer Line with 5 manholes
  • 1200 linear feet of 14” ductile iron secondary water line
  • Street light bases and conduit
  • 14,000 linear feet concrete curb/gutter
  • 20,000 SF sidewalk; adjust utilities to grade pavement markings